Camino al Proyecto

Proceso de Selección Alternativo

La decisión de reconstruir la planta de tratamiento de agua Big Cottonwood vino después de considerar cuidadosamente estrategias alternativas y factores como el costo, la salud y seguridad del agua y la integridad de la estructura confiable.

An organizational chart from left to right that shows the selection process. The starting Alternatives in the March 2021 date range are symbolized by many light blue, semitransparent dots. These dots appear in the first stage, “Screening” (April/May 2021). The dots are decreased in the next stage, “Cost Estimating and Evaluation Criteria,” from April/May 2021 to June/July/2021. The dots further decrease until there are only 4 in the next stage, “Risk and reward,” which appears within the date range from July/August 2021 to September 2021. In the final stage, there is only one light blue dot left for the September 2021 date range.

ALTERNATIVA SELECCIONADA
-- Posibilidades de regionalización

-- Limitar los costos hundidos

Opciones incluidas:

  • Expansión de la huella actual

  • Mudarse a una nueva ubicación

  • Reconstruyendo dentro de la huella actual

 Los siguientes principios rectores también facilitaron el futuro de este proyecto.

Principios Rectores

Un conjunto de valores centrales que establece un marco para el comportamiento esperado y la toma de decisiones.

Es una lista de principios muy apreciados y esperados establecidos por una organización.

In a 2x3 row, icons accompany the six guiding principles that appear in a text-based description list below. The accompanying icons and principle categories are as follows: "This is a water treatment plant first" appears alongside a white cup icon filled with liquid. "Budget & Schedule" appears alongside a calendar icon with a coin that has a dollar sign on its face. "The 5Rs' is accompanied by a simple, white text-based icon ("5Rs"). "Sustainability" is accompanied by a white water droplet surrounded by two arrows pointing to one another in a circular configuration. "Health & Safety" is accompanied by a white shield with a light blue heart in its center. "Engagement & Education" is accompanied by a white icon of 3 people (heads and shoulders only).

For a text description of this image, please read below. 

1. This is a water treatment plant first: Treat Big Cottonwood Creek water to produce high quality drinking water for consumers.

2. Budget & Schedule: focus on staying within the budget and meeting the project schedule

3. The 5 Rs: Design to maximize resiliency, reliability, redundancy, and risk reduction. 

4. Sustainability: Align the facility with SLC Sustainability Goals through pursuing Envision Gold certification.

5. Heath & Safety: Protect public and water treatment plant staff health. Incorporate and consider safety throughout design, construction, and operation.

6. Engagement & Education: Incorporate public engagement and education and internal SLCDPU personnel where possible.